Trade Takeoffs Built for Bid Day
Edge Estimates prepares trade-specific quantity takeoffs and cost estimates for specialty subcontractors across all 50 states. You send drawings, we return a line-item estimate in CSI MasterFormat — or your own cost codes — with marked-up plans in 24 to 72 hours. Fixed fee, quoted within two hours, no retainer.
What We Accept
- PDF plan sets
- DWG, DXF, DWF, RVT files
- Specifications & addenda
- Invitation-to-bid packages
- Incomplete sets (assumptions noted)
- Union, open-shop, or prevailing wage
- MasterFormat, UniFormat, or your codes
What Are Subcontractor Estimating Services?
Subcontractor estimating services are outsourced cost analysis services that measure material quantities, calculate labor hours, and price a single trade scope so a specialty contractor can submit a competitive bid. Unlike a general contractor’s estimate, which spans an entire building, a subcontractor estimate covers one trade package — electrical, mechanical, concrete, drywall, roofing — in the depth that trade requires, and flags any scope that falls between the packages a general contractor has divided the job into.
That last point is the part most estimating providers skip. When a general contractor splits a project into bid packages, the seams between those packages are where money leaks. Fire-caulking that could sit with the drywall sub or the mechanical sub. Housekeeping pads that may belong to concrete or to the equipment installer. Temporary power that either the electrician carries or nobody does. A takeoff that measures your quantities correctly but says nothing about those seams still leaves you exposed.
Every estimate Edge Estimates prepares for a subcontractor includes a written scope section that lists what is included, what is excluded, and what we assumed. You can lift that section straight into your scope letter.
Why Subcontractors Choose Edge Estimates
Subcontractors choose Edge Estimates because the work is priced per project instead of by retainer, delivered in 24 to 72 hours, and formatted in the cost-code structure the sub already uses. Estimates are prepared by trade-specific estimators using Bluebeam Revu, PlanSwift, FastPIPE, and RSMeans pricing adjusted to the project zip code.
Edge Estimates has operated since 2016 out of Los Angeles, with a regional office in Dallas. The team is built around trade specialists rather than generalists — the estimator who prices your process piping is not the same person who prices your flooring, because those two takeoffs demand different reference knowledge and different software. Meet our estimating team.
Trade-level estimators, not generalists
Electrical goes to an electrical estimator who reads panel schedules and one-line diagrams. Piping goes to someone who works from P&IDs and isometrics. Trade fluency is what keeps a bid credible.
No retainer, no monthly minimum
Pay per estimate. Fixed fee quoted before any work starts. If your bid volume is seasonal, your estimating spend moves with it instead of sitting as fixed overhead.
Your cost codes, not ours
Standard delivery is CSI MasterFormat. If your accounting system runs on internal cost codes or UniFormat, we build the estimate in that structure so it imports without rework.
Zip-code accurate pricing
RSMeans location factors applied at the project zip code, plus a proprietary cost database built from vendor quotes. Send us your own labor rates and we use those instead.
Fast enough for a real deadline
Fixed-fee quote inside two hours of receiving drawings. Single-trade takeoffs typically land in 24 hours. Multi-trade packages in 48 to 72.
Confidentiality on request
Drawings are used only to prepare your estimate and are never shared. We will execute an NDA before you send anything if your project requires it.
Our Subcontractor Estimating Services
Most subcontractors come to us for one of five things. You can request any of them individually — there is no bundled package you have to buy into.
Trade-Specific Quantity Takeoffs
A measured count of everything your scope installs, organized by system and specification. Linear feet of conduit by size and type. Tons of structural steel by member. Square feet of drywall by assembly and finish level. Cubic yards of concrete by mix design. Each line carries its unit of measure, a waste factor where appropriate, and a reference back to the drawing sheet it came from, so you can check any number in about ten seconds.
Full Cost Estimates
The takeoff with material pricing, labor hours, and equipment allowances applied. Labor is calculated at productivity rates appropriate to the trade and the conditions — overhead work, confined space, occupied-building phasing, and night shift all carry different rates, and we adjust rather than applying a flat number. You get material and labor split on every line so you can see where the cost actually sits.
Bid Package Review and Scope Analysis
We read the specification sections that apply to your trade, track the addenda, and identify scope that is either assigned ambiguously or missing from the drawings entirely. This is delivered as a written list of clarifications you can send to the general contractor before bid day, or carry as documented exclusions in your proposal.
Change Order and Claim Estimates
Once you are on the job, scope changes. We prepare change order pricing from the original takeoff so the delta is defensible — original quantity, revised quantity, the difference, and the cost impact including any productivity loss from resequencing. Having the baseline documented is what turns a change order conversation into a short one.
Bid Review — A Second Set of Eyes
You built the estimate in-house and want it checked before it goes out. We take your numbers and the drawings and produce an independent takeoff, then reconcile the two line by line and tell you where they diverge and why. Subcontractors use this on high-value bids where being 15% off in either direction is expensive.
Which Trades Do You Estimate?
Edge Estimates covers the full range of specialty trade scopes across CSI MasterFormat Divisions 02 through 33 — sitework and demolition, concrete, masonry, structural steel, rough and finish carpentry, thermal and moisture protection, openings, interior finishes, and the complete MEP package including plumbing, HVAC, electrical, and fire suppression.
Selective and structural demolition volumes, hazardous material allowances, clearing and grubbing, haul-off and disposal quantities
Footings, slabs, walls, and columns by mix design; formwork contact area; rebar tonnage by size; embeds, joints, and finishes
CMU and brick counts by size and bond, grout and reinforcing volumes, lintels, control joints, cleaning and sealing area
Structural steel tonnage by member, joists and metal deck, stairs and railings, connections, embeds, shop and field coatings
Rough framing board feet, sheathing area, blocking, architectural millwork by linear foot and assembly type
Roof area by system and slope, insulation R-value and thickness, membrane and flashing, firestopping, air and vapor barriers
Door and frame schedules with hardware sets, storefront and curtain wall by square foot, glazing types, louvers
Drywall by assembly and finish level, framing, ACT and specialty ceilings, flooring by type, tile, paint by substrate and coat count
Sprinkler head counts by type and coverage, pipe by diameter and material, risers, standpipes, pumps, valves and devices
Domestic water and sanitary waste by diameter and material, fixture counts and rough-in, gas piping, insulation, hangers and supports
Sheet metal weight by gauge and system, fittings, equipment schedules, hydronic piping, controls, testing and balancing
Conduit and wire by size and type, device and fixture counts, panel schedules, switchgear, feeders, grounding, terminations
Structured cabling by drop, pathways, racks, access control and camera counts, fire alarm devices and circuits
Cut and fill volumes from surface comparison, over-excavation, shoring, paving and base course area, striping, landscape and irrigation
Water, sewer, storm, and dry utility runs by diameter and depth; structures, manholes, trench and bedding volumes
Working in a scope not listed here? Send the drawings and we will confirm coverage before quoting. Related trade pages: Electrical Estimation · Mechanical Estimation · Plumbing Estimation · Concrete Estimation · Drywall Estimation · Structural Steel
Industries and Project Types We Serve
The same trade scope prices differently depending on the building it sits in. A hospital electrical package carries redundancy, isolated grounding, and infection-control phasing that an office fit-out does not. We adjust the productivity assumptions accordingly.
Commercial & Office
New build, core and shell, tenant improvements, and occupied-building renovations with phasing and after-hours work.
Healthcare
Hospitals, surgical centers, and clinics — infection control barriers, medical gas, redundant systems, OSHPD-level documentation.
Education
K–12 and higher education, frequently prevailing wage, summer-window schedules, and public bid form requirements.
Multifamily & Residential
Podium and wrap construction, repetitive unit takeoffs by type, custom and production single-family.
Industrial & Manufacturing
Process piping, equipment setting, heavy electrical distribution, fireproofing. See Industrial Estimating.
Retail & Hospitality
Rollout programs with repeatable scope, restaurant build-outs, hotel guest room and public area packages.
Warehouse & Distribution
Tilt-up and pre-engineered structures, dock equipment, high-bay lighting, ESFR sprinkler, large-area slabs.
Public & Civil
Municipal, federal, and transit work with Davis-Bacon wage compliance. See Public Projects.
Data Centers & Mission Critical
Redundant power and cooling paths, busway, containment, commissioning-heavy scopes with tight tolerances.
Who Can Benefit from Outsourced Estimating?
Outsourced estimating helps subcontractors whose bid volume exceeds their internal estimating capacity, who are entering an unfamiliar market or building type, who face a deadline inside 72 hours, or whose volume does not yet justify a full-time estimator’s salary and software costs.
We take two while your estimator focuses on the one with the best win probability. You stop declining invitations because of bandwidth.
The owner or PM stops estimating at 10pm. Bids get prepared by someone whose full-time job is estimating.
You get a credible first number in a market where you have no historical cost data to draw on.
Single-trade takeoffs typically deliver in 24 hours. Tell us the deadline and we confirm feasibility before you approve the quote.
A full-time estimator plus takeoff software licenses runs well into six figures annually. Per-project pricing scales down when your pipeline does.
An independent second estimate on a job that could make or break the year is cheap insurance against a costly error.
Coverage without a rushed hire. Bidding continues while you recruit properly.
Honestly — keep this in-house. Your own historical productivity data will beat any outside estimate on work you do every week.
Where we do not add value: if you bid the same scope repeatedly and have clean historical cost data, your internal numbers are better than ours. Outsourcing is a capacity and coverage tool, not a replacement for trade knowledge you already own. Most of our long-term clients use us alongside an in-house estimator, not instead of one.
What’s Included in Every Estimate
Every deliverable includes all six items below. Nothing here is an upcharge.
Line-item Excel workbook
Organized by CSI MasterFormat division or your cost codes, with material, labor hours, labor cost, and equipment separated on each line so you can adjust any assumption yourself.
Color-coded marked-up plans
The PDF drawing set annotated by system so every quantity traces back to a specific location on a specific sheet. This is what makes the estimate auditable rather than a black box.
Written scope notes
Inclusions, exclusions, and assumptions in plain language, ready to paste into your proposal or scope letter.
Labor hour summary
Total man-hours by activity with the productivity basis stated, so you can sanity-check against your own crews before submitting.
Clarification list
Questions worth sending to the general contractor, and any scope gaps between bid packages that we spotted in the documents.
One round of revisions
If an addendum lands or the scope shifts after delivery, the first update is included at no charge.
How Our Estimating Process Works
The process runs in four steps. Email your drawings to plans@edgeestimates.us, receive a fixed-fee quote within two hours, approve it, and receive the completed estimate with marked-up plans in 24 to 72 hours. No work begins and no payment is due until you approve the quote.
Send your drawings
Email plans to plans@edgeestimates.us. Include the project zip code, your bid deadline, the trades you need, and your labor basis — union, open-shop, or prevailing wage. If your set is incomplete, say so; we work from partial documents regularly and note the assumptions.
Get a fixed-fee quote in 2 hours
An estimator reviews the scope and sends a firm price and delivery date. No hourly billing, no estimate that grows once work is underway. If your deadline is tighter than our standard window we tell you before you commit.
We build the takeoff
A trade specialist performs the takeoff in Bluebeam Revu, PlanSwift, or trade-specific software, then applies RSMeans pricing at your project zip code — or your own labor rates if you supplied them. Specifications and addenda are read alongside the drawings, not skipped.
Receive and review
The Excel workbook, marked-up plans, and scope notes arrive together. Walk through any line with the estimator who built it. One revision round is included if the scope moves.
Why Estimating Accuracy Decides Whether You Make Money
A subcontract bid has thinner margin than most people outside the trade assume. Competitive specialty work commonly targets an 18–25% gross margin, and that gets consumed quickly by a single estimating error. Two mistakes account for most of the damage.
Labor burden is the most common miss
Base wage is not labor cost. Add payroll taxes, workers’ compensation, and benefits and the fully burdened rate typically runs 25–40% above the base wage. A bid built on unburdened wages looks competitive and loses money on every hour worked. Every Edge Estimates deliverable states the labor basis explicitly so you can confirm it matches your actual burden before you submit.
Scope gaps surface after award, not before
The second failure is accepting loose scope boundaries. Work that sits between two bid packages — firestopping, housekeeping pads, temporary services, cutting and patching, final cleaning — gets assumed by nobody at bid time and assigned to somebody after award. That somebody is usually whichever sub has the weakest paper trail. Our written scope section exists specifically to give you that paper trail.
Bid with confidence
Knowing your real cost before submitting means you can price to win without pricing below cost.
Protect your margin
Documented quantities and stated assumptions give you a defensible baseline for every change order that follows.
Bid more work
Capacity is the real constraint on win rate. More bids submitted at the same accuracy means more awards.
Buy materials better
Accurate quantities support early procurement and bulk pricing instead of reactive ordering at retail.
Sharpen your own data
Comparing our productivity assumptions against your actuals tells you where your internal rates have drifted.
Look professional to GCs
A clean, itemized proposal with clear exclusions reads as a lower-risk sub. That matters in bid leveling.
No estimate removes construction risk. Site conditions, design changes, material lead times, and labor availability all move final cost. What a detailed estimate does is shrink the range of uncertainty you carry into a bid — and document what you priced, so a dispute later is a short conversation.
Estimating Software and Technology We Use
Edge Estimates uses Bluebeam Revu for digital plan measurement, PlanSwift and Trimble for structural and civil takeoffs, FastPIPE and FastDUCT for piping and sheet metal, and RSMeans cost data adjusted by project zip code — alongside a proprietary cost database built from current vendor quotes.
Bluebeam Revu
Digital measurement and markup on PDF sets. This is what produces the color-coded plans you receive, so quantities stay traceable to the sheet.
PlanSwift
DWG and PDF takeoffs for concrete, framing, finishes, and general building scopes with assembly-based quantity generation.
Trimble
Structural steel detailing quantities, civil earthwork surface comparison, and complex site layout takeoffs.
FastPIPE / FastDUCT
Piping takeoffs by spec and diameter from P&IDs and isometrics; sheet metal weight by gauge and system for HVAC.
RSMeans — Zip-Code Adjusted
Material, labor, and equipment cost data with location factors applied at the project zip code rather than a national average.
Proprietary Cost Database
Vendor quotes and trade data collected since 2016, used to sanity-check published pricing against what the market is actually charging.
Open, unlocked Excel deliverables
Every workbook ships with live formulas and no protected cells. Change a labor rate or a waste factor and the estimate recalculates — nothing is hardcoded, and nothing is hidden from you.
How We Keep Estimates Accurate
Accuracy is a process question, not a talent question. Four controls sit on every estimate before it leaves.
The estimator assigned holds working knowledge of that specific trade. Electrical work is not priced by whoever is available.
Quantities are reconciled against the spec sections and every addendum, not the drawings alone. Drawing-only takeoffs miss material grades, finish levels, and testing requirements that carry real cost.
A second estimator reviews the workbook against the marked-up plans before delivery, checking unit-of-measure consistency, productivity assumptions, and completeness against the scope list.
Anything not determinable from the documents is written down rather than quietly guessed. If the drawings do not show it, the estimate says so.
We also close the loop where clients let us. If you send back actual installed quantities and hours after a job, we compare them against what we estimated and adjust our productivity assumptions for your future work. That feedback is the most valuable calibration data available, and it is why long-term clients get progressively tighter numbers.
How Much Do Subcontractor Estimating Services Cost?
Edge Estimates charges $250 to $2,500 per estimate on a fixed-fee basis. Single-trade takeoffs for a small to mid-size project start around $250. Multi-trade packages and large commercial scopes typically run $800 to $2,500. Every project is quoted individually within two hours of receiving drawings, and no payment is due until you approve the quote.
24 hours
Specialty subs on one package
24 – 48 hours
Full-building trade scope
48 hours
Subs carrying combined scope
48 – 72 hours
Design-build and major projects
24 – 48 hours
High-value bids needing a check
24 hours
Existing clients mid-project
Fee depends on drawing count, scope complexity, and the number of divisions involved — not on your project’s contract value. A clean 40-sheet set costs less to estimate than a messy 40-sheet set, and we would rather tell you that upfront than discover it halfway through.
What You Receive
Line items by division or your cost codes; material, labor hours, labor cost, and equipment separated; live formulas, unlocked
Color-coded annotation by system with quantities tied to sheet and location
Inclusions, exclusions, assumptions — written for direct use in your proposal
Man-hours by activity with the productivity basis stated
Questions for the GC and identified gaps between bid packages
Available on request without cost application, for subs who price internally
Bid deadline coming up?
Email your drawings and we will return a fixed-fee quote within two hours. Most single-trade takeoffs deliver in 24 hours.
Where Do You Provide Estimating Services?
Edge Estimates serves subcontractors in all 50 states from its Los Angeles headquarters and its Dallas regional office. Every estimate is priced using RSMeans location factors at the project zip code, so pricing reflects local labor and material markets rather than national averages.
Los Angeles, California — Headquarters
4319 W Jefferson Blvd, Los Angeles, CA 90016. Covering California, Nevada, Arizona, Oregon, Washington, and the Southwest. California carries some of the highest construction labor rates in the country between prevailing wage requirements and union scale agreements — both are handled as standard.
Dallas, Texas — Regional Office
18625 Midway Rd, Dallas, TX 75287. Covering Texas, Oklahoma, Louisiana, Arkansas, and the Gulf Coast — including one of the highest-volume open-shop commercial markets in the United States.
We Cover All 50 States — Including High-Volume Construction Markets:
Send Us Your Drawings for a Trade Takeoff
To receive a fixed-fee quote, email your drawings to plans@edgeestimates.us. If your drawing set is incomplete or still in design development, note that in your submission — we will confirm what is achievable at that stage before you commit to anything.
Useful information to include:
- Project name and location — city, state, and zip code for RSMeans pricing
- Drawing set — PDF, DWG, DXF, DWF, or RVT files
- Applicable specifications — include all addenda
- Bid deadline — or required delivery date
- Labor type — union, open-shop, or prevailing wage
- Trades to cover — and which to prioritize if budget is constrained
- Preferred format — MasterFormat, UniFormat, or your internal cost codes
Get a Fixed-Fee Quote
We will send a fixed-fee quote within 2 hours. The estimate is delivered in 24 to 72 hours of quote approval. Both the Los Angeles and Dallas offices handle subcontractor inquiries.
Subcontractor Estimating: Common Questions
Questions subcontractors, specialty trades, and project managers ask before sending drawings to Edge Estimates.
How much do subcontractor estimating services cost?
Edge Estimates charges $250 to $2,500 per estimate on a fixed-fee basis. Single-trade takeoffs for small to mid-size projects start around $250, while multi-trade packages covering several CSI divisions typically run $800 to $2,500. Fees are based on drawing count and scope complexity rather than your contract value. You receive a firm quote within two hours of sending drawings, and nothing is owed until you approve it.
How long does a subcontractor takeoff take?
Most single-trade takeoffs are delivered within 24 hours of quote approval. Multi-trade packages covering two to four divisions take 48 hours, and large multi-division commercial scopes take 48 to 72 hours. The fixed-fee quote itself comes back within two hours of receiving your drawings. If your bid deadline is tighter than the standard window, note it in your submission and we will confirm feasibility before you commit.
What is the difference between a takeoff and a cost estimate?
A quantity takeoff measures physical materials — linear feet of conduit, cubic yards of concrete, square feet of drywall, tons of steel. A cost estimate applies current material pricing, labor hours, and equipment costs to those quantities to produce a total. Edge Estimates delivers both as standard. If you price internally and only need verified quantities, request a quantity-only takeoff and the fee is adjusted accordingly.
What documents do you need to prepare an estimate?
At minimum, a drawing set — PDF, DWG, DXF, DWF, RVT, or clear images all work. Specifications and addenda should be included where available, since material grades, finish levels, and testing requirements carry real cost that drawings alone do not show. Also include the project zip code for pricing, your bid deadline, the trades you need covered, and whether labor should be union, open-shop, or prevailing wage.
Can you estimate from incomplete drawings?
Yes. Working from partial sets is routine, particularly for early budget pricing and design-development bids. When information is missing we document the specific assumption made and flag the item as requiring field verification or drawing clarification. You receive a usable number plus a clear list of what still needs confirmation, rather than a false sense of precision.
Can you use my own labor rates and cost codes?
Yes, and we recommend it. Send your fully burdened labor rates — union scale, prevailing wage, or negotiated open-shop — and we apply those instead of published averages. The same applies to structure: the default is CSI MasterFormat, but if your accounting system runs on internal cost codes or UniFormat we build the workbook in that format so it imports without rework.
Is outsourcing estimating worth it for a small subcontractor?
It depends on your bid volume. A full-time estimator’s salary plus takeoff software licenses represents a significant fixed annual cost, so if you bid a handful of projects a month, per-project pricing is usually the better economics. Once you are consistently bidding twenty or more projects monthly, the math starts favoring an in-house hire. Many subcontractors run both: an internal estimator on core work, outsourced support during peak periods.
How accurate are outsourced construction estimates?
Accuracy depends primarily on document quality. With a complete drawing set and specifications, a detailed trade takeoff should land within a few percent on quantities — measurement from drawings is objective work. Cost accuracy carries more variance because it depends on current material pricing, your actual crew productivity, and market conditions. This is why every deliverable states its labor and pricing basis explicitly: you can validate the assumptions against your own history before submitting.
Do you help identify scope gaps between bid packages?
Yes, and it is one of the more valuable parts of the service. When a general contractor divides a project into trade packages, work at the seams often goes unassigned — firestopping, housekeeping pads, temporary services, cutting and patching, final cleaning. We flag these in a written clarification list you can send to the GC before bid day, and document them as exclusions in your scope notes so your position is on paper if the question arises after award.
Can you review an estimate my team already prepared?
Yes. For a bid review we take your numbers and the drawings, produce an independent takeoff, then reconcile the two line by line and report where they diverge and why. Subcontractors typically use this on bids large enough that a 15% error in either direction would materially affect the year. It is also useful for onboarding a newer estimator, since the reconciliation shows exactly which assumptions differed.
Do you sign non-disclosure agreements?
Yes. Drawings, specifications, and bid documents sent to Edge Estimates are used solely to prepare your estimate and are never shared with third parties. If your project requires a formal NDA before documents change hands, contact us first and we will execute one prior to receiving anything.
Do you prepare change order estimates after a project starts?
Yes. Change order pricing is prepared from the original takeoff, so the delta is documented — original quantity, revised quantity, the difference, and the cost impact including any productivity loss from resequencing or out-of-order work. Having the baseline already on paper is what keeps a change order discussion short and factual.
Which trades do you estimate?
Coverage spans CSI MasterFormat Divisions 02 through 33: demolition and sitework, concrete, masonry, structural and miscellaneous metals, carpentry and millwork, roofing and waterproofing, doors and glazing, interior finishes including drywall, flooring and paint, fire suppression, plumbing, mechanical and HVAC, electrical, low voltage, earthwork, and site utilities. If your scope is not listed, send the drawings and we will confirm coverage before quoting.
How do I get started?
Email your drawings to plans@edgeestimates.us with the project zip code, your bid deadline, the trades you need, and your labor basis. An estimator reviews the scope and sends a fixed-fee quote within two hours. Approve it and your estimate is delivered in 24 to 72 hours. You can also call the Los Angeles office at (213) 784-0979 or the Dallas office at (469) 829-7575 to talk through a scope before sending anything.
Answers Subcontractors Need Before They Bid
The questions specialty contractors and estimators ask most often — answered clearly with specific numbers, scope detail, and actionable context.
Edge Estimates is a construction estimating company based in Los Angeles, CA with a regional office in Dallas, TX. The company prepares trade-specific quantity takeoffs and cost estimates for specialty subcontractors, general contractors, suppliers, and project owners across all 50 US states. Coverage spans CSI MasterFormat Divisions 02 through 33, including electrical, mechanical, plumbing, fire suppression, concrete, masonry, structural steel, carpentry, roofing, and interior finishes. Estimates are delivered in 24 to 72 hours as a CSI MasterFormat Excel workbook with color-coded marked-up plans. Fixed-fee quotes are provided within 2 hours of receiving drawings.
A subcontractor estimate includes a line-item Excel workbook organized by CSI MasterFormat division or the subcontractor’s own cost codes, with material quantities, labor hours, labor cost, and equipment allowances separated on every line. It also includes color-coded marked-up plans in PDF so each quantity traces back to a specific drawing sheet, a written scope section listing inclusions, exclusions and assumptions, a labor hour summary with the productivity basis stated, and a clarification list identifying questions for the general contractor and any scope gaps between bid packages. One revision round is included.
Subcontractor estimating at Edge Estimates costs $250 to $2,500 per estimate on a fixed-fee basis. Single-trade takeoffs start at $250. Multi-trade packages covering two to four divisions range from $800 to $1,800, and large multi-division commercial scopes run $1,500 to $2,500. Fees depend on drawing count and scope complexity, not contract value. No retainer, no hourly billing, and no payment until the quote is approved.
Edge Estimates delivers subcontractor takeoffs in 24 to 72 hours. Single-trade takeoffs — electrical only, plumbing only, or concrete only — are typically ready in 24 hours. Multi-trade packages covering two to four CSI divisions take 48 hours, and large multi-division commercial scopes take 48 to 72 hours. The fixed-fee quote is sent within 2 hours of receiving drawings, and no estimating work begins until the quote is approved.
The process runs in 4 steps: (1) Email drawings to plans@edgeestimates.us with the project zip code, bid deadline, trades needed, and labor basis. (2) Receive a fixed-fee quote within 2 hours. (3) A trade-specific estimator performs the takeoff using Bluebeam Revu, PlanSwift, or FastPIPE, with RSMeans pricing applied at the project zip code. (4) Receive the Excel workbook, marked-up plans, and scope notes in 24 to 72 hours. No payment until step 2 is approved.
Trade Takeoffs Delivered in 24–72 Hours
Send your drawings to plans@edgeestimates.us. We review the scope, return a fixed-fee quote within two hours, and deliver a line-item estimate with color-coded marked-up plans before your bid deadline. No retainer, no monthly minimum, no payment until you approve the quote.
Licensed construction cost estimating company founded in 2016. Trade-specific takeoffs and estimates for subcontractors, general contractors, engineers, and owners nationwide. Offices in Los Angeles and Dallas.
Services
© 2026 Edge Estimates LLC. All rights reserved. | 4319 W Jefferson Blvd, Los Angeles, CA 90016
Subcontractor Estimating Services · CSI MasterFormat · 24–72 Hour Turnaround · All 50 States